Water Treatment Control System
- Industry
- Water treatment
- Stack
- PLC · SCADA · HMI · Alarms

PLC · SCADA
Tanks, pumps and thickeners supervised from a single SCADA.
Gallery


Process
Process, constraints and acceptance criteria.
Mechanical, electrical and controls design.
Fabrication, assembly and integration.
Testing, tuning and documented hand-over.
Tell us the context. We'll come back with a concrete path.
antonio@machinnox.com · +52 656 356 1509